Countermeasure For Sediment In Wonogiri Multipurpose DAM Reservoir (I) (JICA LOAN No. IP-552) Package No.7 (ICB): Procurement Of Additional Dredging Systems : Completion Report Volume I: Main Report
Detail Buku
Penerbit: Departemen Pekerjaan Umum,
BIBID: 0010-1023000310
Tahun Publikasi: 2017
Di Publikasi Di: Jakarta : Departemen Pekerjaan Umum, 2017
Bahasa:
Indonesia
Informasi Koleksi
No Barcode
No Panggil
Akses
Lokasi
Ketersediaan
0019/WG/2017
627.8 NIP c
Dapat dipinjam
Ruang Baca Umum
Tersedia
Karya Terkait
Kali Konto Project, Volume II Meteorogical and Hydrological Data
Nippon Koei Co, Ltd,
Kali Konto Project, Volume IV Meteorogical and Hydrological Data
Nippon Koei Co, Ltd,
Kali Konto Project Selorejo DAM and Power Station Penstock, Gates, Trash Racks and Accessories Specification For Purchase
Nippon Koei Co, Ltd,
Kali Konto Project Selorejo dam and Power Station Turbine, Generator, Tranformer, Switchgear, Auxillary Equipment, and Miscellaneous Materials Specification For Purchase, Transportation and Erraction
Nippon Koei Co, Ltd,
Kali Konto Project Selorejo DAM and Power Station Specification for Construction