Countermeasure For Sediment In Wonogiri Multipurpose DAM Reservoir (I) (JICA LOAN No. IP-552) Package No.7 (ICB): Procurement Of Additional Dredging Systems : Completion Report Volume I: Main Report

Countermeasure For Sediment In Wonogiri Multipurpose DAM Reservoir (I) (JICA LOAN No. IP-552)  Package No.7 (ICB): Procurement Of Additional Dredging Systems :  Completion Report Volume I: Main Report

Detail Buku

  • Penerbit: Departemen Pekerjaan Umum,
  • BIBID: 0010-1023000310
  • Tahun Publikasi: 2017
  • Di Publikasi Di: Jakarta : Departemen Pekerjaan Umum, 2017
  • Bahasa: Indonesia

Informasi Koleksi

Karya Terkait

Kali Konto Project, Volume II Meteorogical and Hydrological Data
Kali Konto Project, Volume II Meteorogical and Hydrological Data

Nippon Koei Co, Ltd,

Kali Konto Project, Volume IV Meteorogical and Hydrological Data
Kali Konto Project, Volume IV Meteorogical and Hydrological Data

Nippon Koei Co, Ltd,

Kali Konto Project Selorejo DAM and Power Station Penstock, Gates, Trash Racks and Accessories Specification For Purchase
Kali Konto Project Selorejo DAM and Power Station Penstock, Gates, Trash Racks and Accessories Specification For Purchase

Nippon Koei Co, Ltd,

Kali Konto Project Selorejo dam and Power Station Turbine, Generator, Tranformer, Switchgear, Auxillary Equipment, and Miscellaneous Materials Specification For Purchase, Transportation and Erraction
Kali Konto Project Selorejo dam and Power Station Turbine, Generator, Tranformer, Switchgear, Auxillary Equipment, and Miscellaneous Materials Specification For Purchase, Transportation and Erraction

Nippon Koei Co, Ltd,

Kali Konto Project Selorejo DAM and Power Station Specification for Construction
Kali Konto Project Selorejo DAM and Power Station Specification for Construction

Nippon Koei Co, Ltd,