Feasibility Study Colume 1 Main Report

Feasibility Study Colume 1 Main Report

Detail Buku

  • Penerbit: European Economic Community
  • BIBID: 0010-1023000704
  • Tahun Publikasi:
  • Di Publikasi Di: Kediri : European Economic Community
  • Bahasa: Inggris

Informasi Koleksi

Karya Terkait

Feasibility Study Colume 1 Main Report
Feasibility Study Colume 1 Main Report

European Economic Community

Feasibility Study Volume 2 Main Report Drawings
Feasibility Study Volume 2 Main Report Drawings

European Economic Community,

Surabaya Urban Development Project (Technical Aisistance from IBRD Loan No.3726) Surabaya River Pollution Control Action Plan study Final Report Volume 3 Annexes a To E
Surabaya Urban Development Project (Technical Aisistance from IBRD Loan No.3726) Surabaya River Pollution Control Action Plan study Final Report Volume 3 Annexes a To E

PT Indra Karya,