Surabaya River Improvement Project (stage II) (Phase-1) Tender Documents For Package 4: Repair of Gubeng DAM

Surabaya River Improvement Project (stage II) (Phase-1) Tender Documents For Package 4: Repair of Gubeng DAM

Detail Buku

  • Penerbit: Ministry of Public Works Directorate Generel of Water Resources Development Brantas River Basin Development Execution Office,
  • BIBID: 0010-0923000277
  • Tahun Publikasi: -
  • Di Publikasi Di: Surabaya : Ministry of Public Works Directorate Generel of Water Resources Development Brantas River Basin Development Execution Office, -
  • Bahasa: Inggris

Informasi Koleksi

Karya Terkait

Engineering and Design General Design And Construction Considerations dor Earth And Rock-fill Dams
Engineering and Design General Design And Construction Considerations dor Earth And Rock-fill Dams

-,

Perhitungan Volume Flushing Sedimentasi Voorkanaal I & II Dari Tanggal 30/4/74, S/D 29/5/74 :  Lengkong Baru
Perhitungan Volume Flushing Sedimentasi Voorkanaal I & II Dari Tanggal 30/4/74, S/D 29/5/74 : Lengkong Baru

-,

Studi Pengembangan Usaha dan Prospek Bisnis di Indonesia Tahun 1996-2000 :  Kajian Pengembangan Usaha dan Prospek Bisnis Sektor Textile
Studi Pengembangan Usaha dan Prospek Bisnis di Indonesia Tahun 1996-2000 : Kajian Pengembangan Usaha dan Prospek Bisnis Sektor Textile

IBRSC,

Himpunan Peraturan Perundangan Pengelolaan Kuantitas dan Kualitas Air
Himpunan Peraturan Perundangan Pengelolaan Kuantitas dan Kualitas Air

Biro Bina Lingkungan Hidup Sekretariat Wilayah Daerah Tingkat I Jawa Timur

Surat Keputusan Bersama Menteri Keungan Republik Indonesia dan Menteri Negara Perencanaan Pembangunan Nasional/Ketua Badan Perencanaan Pembangunan Nasional
Surat Keputusan Bersama Menteri Keungan Republik Indonesia dan Menteri Negara Perencanaan Pembangunan Nasional/Ketua Badan Perencanaan Pembangunan Nasional

Republik Indonesia,